Updated November 19, 2026. Checked against Texas Property Code Chapter 53 by our team.
On a private Texas job, you may qualify for a mechanics lien if you provided labor, materials, specially fabricated material, design or survey work, landscaping or demolition under a contract with the owner (or the owner’s agent), the original contractor or a subcontractor (Property Code 53.021). That covers the original contractor, subcontractors at any tier, material suppliers, equipment rental companies, and licensed architects, engineers and surveyors. In Texas, filing the lien means recording a sworn lien affidavit with the county clerk (53.052).
Qualifying is not enough on its own. To claim the lien under Chapter 53 you also send the required notices and record the affidavit on time, and to collect through it you may have to sue to foreclose by the 53.158 deadline. If a contractor or subcontractor hired you, you send a notice of claim for each unpaid month, often called a pre-lien notice (53.056).
If the owner hired you, you send no monthly notices. One exception: if you contracted directly with a contractor tied to the owner, you follow the original contractor rules (53.026).
The owner or the owner’s agent
You are the original contractor. No monthly notice. Record the lien affidavit by the 15th day of the 4th month (commercial) or 3rd month (residential) after the month your work was completed, terminated or abandoned (53.052(a)).
The original contractor or a subcontractor, at any tier
You are a subcontractor or supplier. Send a pre-lien notice for each unpaid month, then record the affidavit by the 15th day of the 4th month (commercial) or 3rd month (residential) after your last month of work (53.056, 53.052(b), (c)).
Anyone, on a public project
No mechanics lien on public property. An eligible sub or supplier may have a payment bond claim instead (Government Code 2253).
May not have a Chapter 53 lien
- No contract with the owner, its agent, the original contractor or a subcontractor (53.021).
- A supplier whose buyer only resold the material and did no part of the work (53.001(13)).
- Work on public property (bond claim instead).
Check your deadline in the calculator below.
All of this is for private projects. Public property cannot carry a mechanics lien, so on a Texas public works job an eligible subcontractor or supplier may have a claim against the prime contractor’s payment bond under Government Code Chapter 2253 instead, and a federal job uses the Miller Act bond (40 U.S.C. 3133). See bond claim deadlines.
Who has lien rights in Texas, by the kind of work?
You may have lien rights if you work under a contract with the owner, or with the owner’s agent, trustee, receiver, contractor or subcontractor, and you do one of these (53.021):
- Provide labor or materials for the construction or repair of a building, structure or other improvement.
- Specially fabricate material for the job, even if it was never delivered. It has to be made as a part of this work and be reasonably unsuitable for use elsewhere (53.001(12)).
- Prepare plans, designs, plats or surveys as a licensed architect, engineer or surveyor.
- Provide labor, plants or supplies for landscaping, including retaining walls, berms, irrigation systems and fountains.
- Work on or supply a demolition of an improvement on the property.
“Material” includes reasonable equipment rental and the fuel, power and water used up in the work (53.001(4)), so equipment rental companies are on the list too.

Can a subcontractor file a lien in Texas?
Yes. A subcontractor is anyone who provides labor or materials to meet an obligation to the original contractor or to another subcontractor, at any tier (53.001(13)). A sub of a sub fits the same definition as a sub hired by the general contractor.
To keep the lien valid, a subcontractor sends a notice of claim (the pre-lien notice) to the owner and the original contractor for each unpaid month: by the 15th of the 3rd month after that month on a commercial job, or the 15th of the 2nd month on a residential job (53.056(a), (a-1)). The lien affidavit is then due by the 15th of the 4th month after your last month of work (commercial), or the 3rd month (residential) (53.052(b), (c)).
“Residential” has a set meaning in Chapter 53: a house, duplex, triplex, fourplex or condo unit that an owner lives in or plans to live in (53.001(8) to (10)). A project that does not fit follows the commercial dates. See what defines a residential project.
A subcontractor’s lien is capped at the share of the subcontract price for the labor, materials, overhead and profit you provided, less what you have been paid (53.024).
Can a material supplier file a lien in Texas?
A supplier’s rules depend on who bought from it. If you sold straight to the owner, you are an original contractor and send no monthly notices (53.001(7)). If you sold to the original contractor or to a subcontractor, you are a subcontractor under Chapter 53, so you send a notice for each unpaid month and file the same lien affidavit as a subcontractor (53.001(13), 53.056).
For example, a supplier who delivered in October 2026 on a commercial job sends that month’s notice by Friday, January 15, 2027. The months count from when you delivered, not from your invoice date (53.052(b), 53.056(a-1)). More in our guide to the Texas materialman’s lien.
Can a general contractor file a mechanics lien?
A general contractor can file one too. An original contractor is anyone who contracts with the owner directly or through the owner’s agent (53.001(7)). You send no monthly notices. Your main deadline is the lien affidavit, due by the 15th of the 4th month (commercial) or the 3rd month (residential) after the month your work was completed, terminated or abandoned (53.052(a)).
What if the general contractor is tied to the owner?
Chapter 53 calls this a “purported original contractor”: a contractor that controls the owner or is controlled by it through common ownership of voting stock or ownership interests, or one the owner hired with no good faith intent that it would do the work (53.001(7-a)). If you contracted directly with one, you are treated as an original contractor for perfecting your lien (53.026(a)).
Texas lien rights by who hired you
| Who hired you | What you do first |
|---|---|
| Hired by the owner: original contractor, or a supplier, architect, engineer, surveyor, landscaper or demolition contractor with a direct contract | No monthly notice. Record the lien affidavit by the 15th day of the 4th month (commercial) or the 3rd month (residential) after the month your work was completed, terminated or abandoned (53.052(a)). |
| Hired by a contractor or subcontractor: a subcontractor at any tier, or any of the trades above | Send a pre-lien notice for each unpaid month by the 15th day of the 3rd month (commercial) or the 2nd month (residential) after it. Record the affidavit by the 15th day of the 4th or 3rd month after your last month of work (53.056, 53.052(b), (c)). |
| Sold materials or rented equipment to a contractor or subcontractor | Same as a subcontractor, counted from each month you delivered the materials or the equipment was on the job (53.001(4), (13)). |
| Hired by a contractor or subcontractor to specially fabricate material that was not delivered | Same as a subcontractor, but the clock can start in the month the material would normally have been delivered, if that is later than your last month of work (53.052(b)(2), (c)(2), 53.056(a-1)). |
| Hired by a contractor tied to the owner | Follow the original contractor row (53.026(a)). |
Calculate your notice and lien affidavit dates
Pick your role and the project type, then the last month you provided labor or materials. For a monthly notice, enter that unpaid month instead. The calculator moves dates off weekends and the national holidays in Government Code 662.003(a), not the Texas state holidays in 662.003(b), such as December 24 and 26. The calculator does not add an extra day for those.
Worked example: a subcontractor on a commercial job whose last unpaid month was November 2026.
- Pre-lien notice for November: by Tuesday, February 16, 2027. February 15 is Presidents’ Day, a holiday under Government Code 662.003(a), so the deadline moves a day (53.003(e)).
- Lien affidavit: recorded by Monday, March 15, 2027 (53.052(b)).
- Copy of the filed affidavit: to the owner and the original contractor within 5 days after you file (53.055). If you file on March 15, the 5th day is Saturday, March 20, so it moves to Monday, March 22, 2027.
- Suit to foreclose: by Wednesday, March 15, 2028, one year after the last day to file, unless a recorded agreement with the owner extends it (53.158).
Every month’s dates for both project types are in our Texas lien deadlines cheat sheet.
Can you file a lien on a homestead in Texas?
Only with a written contract. To fix a lien on a homestead, the contract with the owner has to be in writing, signed before the work starts, signed by both spouses if the owner is married, and filed with the county clerk (53.254). If the original contractor signed that contract, it also covers the subcontractors and suppliers who work for that contractor (53.254(d)). See Texas mechanics lien on a homestead.
How to file a mechanics lien in Texas, step by step
- Send each pre-lien notice on time if a contractor or subcontractor hired you: to the owner and the original contractor, in person, by certified mail or by another traceable service (53.056, 53.003(b)).
- Prepare the lien affidavit with the items listed below and sign it under oath (53.054).
- Record it with the county clerk in the county where the property is, by your affidavit deadline (53.052(e)).
- Send a copy of the filed affidavit to the owner within 5 days after you file, and to the original contractor too if you are not the original contractor (53.055).
On a homestead, the written contract rules above also apply, and the affidavit needs a set notice printed at the top of the page (53.254(f)).
Can I file a lien if the owner already paid the general contractor?
You can still file, but the amount the owner’s property can be held for may be limited. The owner is not liable for money paid to the original contractor before your notice gave the owner the right to withhold, except the 10 percent the owner had to hold back during the job and for 30 days after it was done (53.084(a), 53.101).
Money the owner paid the contractor after getting your notice can still be reached (53.084(b)). So the dates you sent each notice, and whether the owner held back the 10 percent, decide how much the lien can reach.
Can I file a lien if I sold to another supplier?
Chapter 53 ties lien rights to the work. A subcontractor under Chapter 53 is someone who provides labor or materials to fulfill an obligation to the original contractor or another subcontractor to perform part of the work (53.001(13)). If your buyer was a subcontractor under that definition, you supplied a subcontractor and the subcontractor rules apply to you.
If your buyer only resold your material to another supplier and did none of the work, the definition may not reach you, so confirm the chain before you count on a lien.
What you need before you file
The lien affidavit has to contain these items, so gather them at the start of each job (53.054(a)):
- The amount you claim, which you swear to.
- The owner’s name and last known address.
- A general description of your work or materials and, if you are not the original contractor, each month you worked or delivered and are owed for.
- The name and last known address of the company that hired you.
- The original contractor’s name and last known address.
- A description of the property that is legally sufficient to identify it.
- Your name and mailing address, and your physical address if it is different.
- If you are not the original contractor, the date you sent each notice of claim and how you sent it.
Our FAQ Who can file a construction lien? has the short answer, and the guide to the monthly notice letter covers the monthly notice. Retainage has its own notice (53.057); see notice of contractual retainage. On a bonded or public job, compare a lien and a bond claim.
Do you need a lawyer to file a mechanics lien in Texas?
Chapter 53 does not require a lawyer to sign the lien affidavit: it can be signed by the person claiming the lien or by someone on its behalf (53.054(a)).
You can send each pre-lien notice yourself, then swear to the lien affidavit before a notary, record it with the county clerk and mail the copies. To prepare them online with self service documents for commercial and residential jobs drafted by attorneys certified in Texas construction lien law, pay per document with no attorney fee, use Texas Easy Lien (pricing and services).